Monday, December 7, 2009

Bathroom Remodel: Day 4

So far, so good. The bathtub and vanity are removed, the new shower pan is is in place, and the shower seat is framed in. I was also able to get some of the backer board installed on the floor. Next step will be to install the plumbing, backer board around shower, and prepare for tile.


Backer board on floor:

The ever-growing pile of tools:
New shower pan:








No comments:

Post a Comment